What Has to Be in a Home Improvement Contract
What a home improvement contract has to include, from the three-day cancellation notice to deposit rules, with a sample outline contractors can adapt.
November 16, 2026
Practical guides for contractors who run their own business, from pricing a job to tax time.
What a home improvement contract has to include, from the three-day cancellation notice to deposit rules, with a sample outline contractors can adapt.
November 16, 2026
A contractor year-end checklist for 2026: collect open invoices, get W-9s from subs before 1099s are due, the January tax dates, and skip the December truck.
November 2, 2026
Your liability policy never covered a bad estimate. The 2026 AI exclusions target something else: injury and damage claims that start with AI. What to check.
October 28, 2026
An escalation clause says who pays when a named material jumps between signing and buying. How to write one for a remodel, and why it should work both ways.
October 21, 2026
Your hourly rate is a year of costs divided by the hours clients actually pay for. How to build it from the bottom up, and why 2,080 hours is the wrong divisor.
October 14, 2026
AI writes a clean scope in seconds and guesses at the numbers that decide your margin. Where it helps on a contractor estimate, and where it will burn you.
October 7, 2026
Finishing is most of the labor on a drywall job, and the finish level sets the price. How to bid hang and finish separately and name a GA-214 level on the estimate.
October 2, 2026
California and Nevada cap a home improvement deposit at $1,000 or 10 percent, and five states stop at a third. Which states cap it, and what the rest require.
September 30, 2026
Half of homeowners now check a contractor estimate with AI. Why the chatbot number runs low, and how to walk the gap line by line without cutting price.
September 23, 2026
Hourly billing pays for the part of the day you can measure and donates the rest. How to price handyman work by the block, and where the license ceiling sits.
September 18, 2026
The Marketing add-on puts a real site for your business on your Jobkore plan for $19 a month more. Hank writes the first draft, and the domain is in your name.
September 9, 2026
Square footage does not predict how long a surface takes. How to price pressure washing off condition and mobilization, and where the wash water legally goes.
September 4, 2026
Record what you agreed to pay each sub on each job, log payments, and see the balance. One question answered completely: what do I still owe?
August 29, 2026
Composite does not cost twice what pressure treated costs; the boards do. How to bid the frame, the ledger, the footings and the access that eat your margin.
August 28, 2026
A seasonal snow contract is a bet on the winter. How to set the number from your own snowfall record, your trigger depth, and a cap that actually holds.
August 25, 2026
A concrete estimate that only prices the mix leaves out where the money goes. How to bid flatwork, footings, overage, and the access nobody charges for.
July 29, 2026
A general contractor estimate has to separate self-performed work, sub quotes, and the coordination nobody prices. How to build one that explains itself.
July 20, 2026
A bathroom remodel estimate priced by square footage misses where the risk actually lives. How to break the bid into sections that hold up past demo day.
July 1, 2026
A plumbing estimate is priced on the rough-in the homeowner never sees, not the faucet they do. How to bid the hidden work so your margin survives.
June 17, 2026
A painting contractor estimate is a labor document, not a paint one. Why per-square-foot underprices prep-heavy jobs, and how to bid so the margin survives.
June 3, 2026
A fence estimate per foot works on a flat, straight run and lies everywhere else. Here is how to bid per linear foot without losing your shirt on gates and grade.
May 20, 2026
Kitchen remodels eat margin in places most contractors never line-item. Here is what belongs in the estimate before the cabinets are even ordered.
May 6, 2026
A residential electrical estimate wins or loses on what is in it. Here are the sections, line items, and exclusions that protect your margin.
April 22, 2026
Hank AI edits your documents by chat, turns field notes into drafts, and looks a document over before you send it. You still set every price.
April 20, 2026
Contractor slow season is a cash-flow problem, not a work problem. Here are 5 moves that pay off before the spring schedule fills back up.
April 16, 2026
Raising your prices as a contractor is less about what you say and more about what your next estimate shows. Here is how to reprice without losing your best clients.
April 14, 2026
Solo contractors don't lose jobs to bigger crews. They lose them to solo contractors who look more professional. Here is what actually separates the two.
April 9, 2026
93% of contractors carry a phone to every job, but over 40% have no job management software. Here is why mobile-first tools change everything.
April 7, 2026
Track multiple job site addresses per client and fill your catalog with pre-built line items for your trade. Both features are live now.
April 2, 2026
96% of construction companies fail before year 10. The ones that survive know their numbers. Here is why a dashboard matters.
April 2, 2026
Most CRMs fail because they were not built for contractors. Here is what actually works for tracking clients, follow-ups, and repeat business.
March 31, 2026
We tried every contractor tool on the market. None of them matched how contractors actually work, so we made our own. What we built, and why.
March 26, 2026
Jobber alternatives for solo contractors and small crews: what each competitor costs as of October 2026, and when Jobber is still the right call.
March 24, 2026
Joist competitors compared for solo contractors: change orders, QuickBooks from the Pro plan, card fees and switching, with October 2026 prices.
March 19, 2026
Capture voice notes, photos, or PDFs on site. Hank AI turns them into structured, priced estimates and invoices you review before sending.
March 18, 2026
Free contractor apps cost more than you think. Higher processing fees, invoice limits, no QuickBooks, and no change orders. Here is what free really costs.
March 17, 2026
On-the-job invoicing means sending the invoice from your phone the moment the work is done. How to do it in a few minutes, and when to wait.
March 12, 2026
The real math on credit card fees for contractors. Spoiler: the cost of not accepting cards is almost always higher than the processing fee.
March 10, 2026
Most contractors over-complicate QuickBooks. Here is what to sync from your invoicing tool, what to skip, and how to set up your chart of accounts right.
March 6, 2026
Stripe charges 2.9% plus 30 cents. That is what you pay with Jobkore. No markup, no hidden fees, no per-transaction surcharge on top.
March 5, 2026
Most non-payment situations resolve with a direct conversation and documentation. Here is the escalation path before it gets legal.
March 3, 2026
The estimate-to-invoice handoff is where contractors lose time and money. Learn why one connected system beats retyping and separate tools.
February 27, 2026
Most contractor tools charge $119 or more per month for QuickBooks integration. We include it at $29/mo because we think that is how it should be.
February 26, 2026
Spreadsheets break when you have five active jobs. Here is how to track deposits, progress payments, and balances without losing money.
February 24, 2026
Estimate terms and conditions for contractors: a sample block you can copy, estimate disclaimer examples by situation, and what each clause protects.
February 20, 2026
A 50% markup is only a 33% margin. Most contractors confuse the two and wonder where their profit went. Here is how to calculate both correctly.
February 18, 2026
A flat list of 30 line items confuses clients. Organized sections build trust, speed up approvals, and carry through to invoicing.
February 13, 2026
Jobkore handles change orders as a built-in workflow: each scope change is priced, signed by your client, and folded into the same invoice.
February 12, 2026
Contractors who present large estimates in person close at 80-90%. Here is how to walk clients through five and six-figure proposals without flinching.
February 10, 2026
Most contractors waste hours retyping field notes into estimates. Here is a workflow that turns site notes, photos, and measurements into a finished doc faster.
February 3, 2026
How to invoice as a contractor: what goes on the invoice, a sample you can copy, billing deposits and draws, follow-ups, and how a sub bills a GC.
January 30, 2026
The sticker price is never the real price. Here is what contractor software actually costs when you add up subscriptions, per-user fees, and processing markups.
January 28, 2026
An honest comparison of contractor estimate apps and estimating software, with October 2026 prices, real tradeoffs, and no affiliate links.
January 26, 2026
78% of clients choose the first contractor to respond. If your estimates take days instead of hours, you are losing jobs before price is even a factor.
January 23, 2026
Jobkore is now fully bilingual. Every screen, every estimate, every invoice works in Spanish, from login to payment, for you and your clients.
January 22, 2026
One undocumented change on a $10K job can wipe out half your profit. Here is how to handle scope changes the right way: signed, tracked, and billed.
January 21, 2026
Most contractors lose jobs on presentation, not price. Learn what winning estimates include and what clients actually look at first.
January 19, 2026
Do contractors take credit cards? Yes, and it is simple to set up. How to accept card payments, what the fees cost on a real invoice, and why waiting costs more.
January 16, 2026
No free tier, and nothing in the app held back for a pricier plan. Every account gets the full app for 14 days with no credit card, then $29 a month.
January 15, 2026
Estimates, invoices, and online payments built by a contractor, for contractors. Meet Jobkore, the all-in-one tool for solo pros and small crews.
January 14, 2026
The answer is neither. The best contractors use a hybrid approach that builds trust without exposing their margins, and here is exactly how to do it.
January 14, 2026
Try a shorter word, or a trade like painting or remodeling.

Your next estimate is on us.
Try for freeI know Jobkore inside and out. Ask me anything.
Hi, I'm Jobkore Help. Ask me about estimates, invoices, getting paid, pricing, or how Jobkore fits your trade.
Thanks. We'll reply by email, and a confirmation is on its way.